Reconstruction and finishing of Zentiva a.s. administrative building:
ing. Emanuel Novák, 2005The existing building was built in 1970. The bearing structutre is precast concrete frame. The building have one underground floor and eleven above – ground floor. The reconstruction and enlargement was made, total volume of the building is twice. The enlargement was made by precast skeleton. The complicated strenghtening of bracing, conections of the skeleton, solution of a fire resistence bearing structure and strenghtening of existing foundation was made.
Foto during construction of the building:
Demolition:Strenthening of foundation:
Mounting of skeleton:
Mounting ofexternal cladding:
Volume of the extension of the building:
Příspěvek na konferenci Beton v PZK II (pdf)