Pipe bridge SIU SAKA Nelahozeves:
ing. Emanuel Novák, ing. Vladimír Chmelař, 2001The steel hanging strands pipe bridge was build up in 1961. The maintenance of pipe bridge was´t realized. The bridge is damaged by corrosion. The diagnostic, static, dynamics analyses and design of repair were made.