Statika s.r.o.

Pipe bridge HN II - Kralupy:

ing. Emanuel Novák, ing. Jan Moták, 2001

Steel cable-stayed bridge was build up in 1978. The bridge is nonsymetricaly suspended The span of bridge is 189 m. The maintenance of pipe bridge was´t realized. The bridge is demaged by the corrosion. The diagnostic,static, dynamics analyses and design of repair was made.

model »