Statika s.r.o.

Completion of Léciva a.s. administrative building:

ing. Emanuel Novák, 2003

The existing  building was built in 1970. The bearing structutre is precast concrete frame. The building haveone underground floor and eleven above – ground floor. The reconstruction and enlargement was made, total volume of the building is twice. The enlargement was made by precast skeleton. The complicated strenghtening of bracing, conections of the skeleton, solution of a fire resistence bearing structure and strenghtening of existing foundation was made.

model »